By 2030, ensure access for all to adequate, safe and affordable housing and basic services and upgrade slums.
1. Urban Community Housing Development
Specific: Develop affordable housing units in urban areas with high slum populations.
Measurable: Construct 1,000 housing units within two years.
Achievable: Collaborate with local governments, NGOs, and private sector partners.
Result Oriented: Reduce the proportion of urban population living in slums by 5% in the targeted area.
Time Bound: Complete by December 2026.
Impact Assessment: Measure the decrease in the proportion of urban population living in slums using household surveys and GIS mapping pre and post-project implementation.
2. Slum Upgrade and Infrastructure Enhancement
Specific: Upgrade existing slums by providing basic infrastructure such as sanitation, clean water, and electricity.
Measurable: Improve infrastructure in five slum areas, benefiting 10,000 residents.
Achievable: Secure funding and support from municipal authorities and international donors.
Result Oriented: Enhance the quality of life and safety for slum residents.
Time Bound: Complete by December 2025.
Impact Assessment: Use pre and post-project surveys to measure changes in living conditions and access to basic services.
3. Affordable Housing Loan Program
Specific: Create a microfinance program to provide low-interest loans for housing.
Measurable: Disburse loans to 2,000 low-income families.
Achievable: Partner with financial institutions and microfinance organizations.
Result Oriented: Enable low-income families to purchase or upgrade housing.
Time Bound: Complete by December 2026.
Impact Assessment: Track the number of families moving out of slums and into adequate housing through loan utilization reports.
4. Public-Private Housing Initiatives
Specific: Form public-private partnerships to build mixed-income housing projects.
Measurable: Develop three mixed-income housing projects, each with 300 units.
Achievable: Engage private developers and secure government incentives.
Result Oriented: Increase the availability of affordable housing in urban areas.
Time Bound: Complete by December 2027.
Impact Assessment: Assess the proportion of units occupied by low-income residents and monitor the overall reduction in slum population.
5. Community Land Trusts
Specific: Establish community land trusts to secure land for affordable housing.
Measurable: Acquire and develop land for 500 housing units.
Achievable: Work with local communities and land trust organizations.
Result Oriented: Provide secure, affordable housing options for low-income families.
Time Bound: Complete by December 2028.
Impact Assessment: Evaluate housing security and reduction in informal settlements through resident feedback and occupancy rates.
6. Incremental Housing Projects
Specific: Develop incremental housing that allows residents to build and expand over time.
Measurable: Implement incremental housing projects for 1,000 families.
Achievable: Partner with NGOs and community organizations for phased development.
Result Oriented: Improve housing conditions and reduce informal settlements.
Time Bound: Complete by December 2029.
Impact Assessment: Measure the progress in housing development and living conditions through periodic surveys and inspections.
7. Sustainable Building Materials Program
Specific: Promote the use of sustainable and affordable building materials in housing construction.
Measurable: Construct 500 housing units using sustainable materials.
Achievable: Collaborate with construction companies and material suppliers.
Result Oriented: Reduce construction costs and environmental impact.
Time Bound: Complete by December 2025.
Impact Assessment: Compare the cost and environmental benefits of sustainable materials versus traditional materials through project reports and resident feedback.
8. Urban Renewal and Slum Clearance
Specific: Conduct urban renewal projects to clear slums and build new housing.
Measurable: Clear and redevelop three major slum areas.
Achievable: Work with urban planners and government authorities.
Result Oriented: Provide safer, more adequate housing for former slum residents.
Time Bound: Complete by December 2027.
Impact Assessment: Monitor the resettlement of slum residents and improvements in housing adequacy through follow-up surveys.
9. Housing Subsidy Programs
Specific: Implement housing subsidies for low-income families to afford rent or purchase homes.
Measurable: Provide subsidies to 5,000 families.
Achievable: Secure government and donor funding.
Result Oriented: Increase access to adequate housing for low-income families.
Time Bound: Complete by December 2026.
Impact Assessment: Track the number of families transitioning from slums to adequate housing through subsidy utilization records.
10. Community Participation in Housing Design
Specific: Engage slum residents in the design and planning of their housing.
Measurable: Facilitate participatory design workshops for 2,000 residents.
Achievable: Partner with urban planners and community organizations.
Result Oriented: Ensure housing meets the needs and preferences of residents.
Time Bound: Complete by December 2025.
Impact Assessment: Evaluate resident satisfaction and the adequacy of housing through post-occupancy evaluations and feedback sessions.